Foreign-made Thermal Oxidizers: Lessons learned
Posted by Steve Murray in Equipment - February 24, 2010
Purchasing and installing a thermal oxidizer is a common solution for manufacturing facilities that need to neutralize toxic air emissions. We recently installed a foreign-made thermal-oxidizer for a client and encountered several issues that we thought would be worthwhile to share with others considering a similar solution. Consider these as lessons learned from our experience.
Potential problems and considerations associated with importing foreign-made thermal oxidizers:
- Delivery time and cost rises when importing any foreign-made equipment.
- The manufacturer may have to send a team of engineers overseas to your site to complete the installation due to their knowledge of the piece of equipment - this can severaly impact your schedule.
- The manufacturer may expect a list of installation requirements to have been completed by the time the thermal-oxidizer is delivered to the site.
- The manufacturer will not accept responsibility if the installation can’t be performed because there is a lack of preparation on the client’s end or installation requirements haven’t been completed.
- In some countries, the burning of liquid chemical waste changes the legal classification of the thermal oxidizer to a “hazardous waste incinerator.”
- Replacement parts often have to be imported and may require the manufacturer’s assistance to be installed.
- Keep in mind that the temperature and residence times required for thermal oxidizers can differ between countries based on emissions regulations.
- You may need special permits for installation and startup, which can also delay your project schedule.
Add a Comment
Comments
Recent Posts
Why Have An Engineering Firm Buy Your Chemical Processing Equipment During Your Project
Posted by Matt in Equipment - December 21, 2011
What makes New England Attractive to Clean Technology Projects and Companies
Posted by Jennifer in Clean Technology - November 18, 2011
Our Take on the Recent High-Tech Manufacturing Stimulus Package
Posted by Jennifer in Government Incentives - November 01, 2011
Understanding Contracting Options for Process Engineering Projects: Percent Billing versus Verified Billing and Reporting
Posted by Bob in General - October 17, 2011
Recent Chemical and Other Manufacturing Funding Successes
Posted by Matt in General - October 03, 2011
Categories
- Alternative Fuels
- Clean Technology
- Controls & Instrumentation
- Engineer Interviews
- Equipment
- General
- Government Incentives
- HVAC
- Industrial Real Estate
Subcontractors & Vendors
- Instrument Vendor
- Instrument Vendor - Transmitter & Analytical
- Notch Mechanical Contractors
- Subcontractor - Electric