info(at)spec-eng.com | phone: 781.221.0123| fax: 781.221.7212|Client Login
Blog
The Value of Early Engineering
Posted by Jennifer Savage in General - April 30, 2010
- Ensures the client and SPEC are the same page for everything: project scope, deliverables, schedule, and budget (before the client has spent a lot of money having detailed engineering done).
- Reduces permitting time because the preliminary design documents can be submitted early, as a preview, to the town (avoiding nasty surprises later on). It also lets potential permitting issues be worked out during detailed design, not after it’s already been completed.
- Saves the client money because they know exactly what they’re getting early on, and they don’t have to waste money changing construction level drawings when they realize the scope isn’t what they wanted.
- Potentially reduces the schedule by allowing the SPEC to identify and order long lead equipment, if the client agrees.
Add a Comment
Comments
Recent Posts
Why Have An Engineering Firm Buy Your Chemical Processing Equipment During Your Project
Posted by Matt in Equipment - December 21, 2011
What makes New England Attractive to Clean Technology Projects and Companies
Posted by Jennifer in Clean Technology - November 18, 2011
Our Take on the Recent High-Tech Manufacturing Stimulus Package
Posted by Jennifer in Government Incentives - November 01, 2011
Understanding Contracting Options for Process Engineering Projects: Percent Billing versus Verified Billing and Reporting
Posted by Bob in General - October 17, 2011
Recent Chemical and Other Manufacturing Funding Successes
Posted by Matt in General - October 03, 2011
Categories
- Alternative Fuels
- Clean Technology
- Controls & Instrumentation
- Engineer Interviews
- Equipment
- General
- Government Incentives
- HVAC
- Industrial Real Estate
Subcontractors & Vendors
- Instrument Vendor
- Instrument Vendor - Transmitter & Analytical
- Notch Mechanical Contractors
- Subcontractor - Electric









