Project Description:

SPEC has provided a Design / Build package for this new manufacturing facility. The project schedule and budgetary goals are being exceeded and the project Team is looking forward to runs of initial product in the next 2-3 weeks.

Project Highlights:

  • Contract Basis Design / Build - Open Book
  • Contract Value $ 8.8 million (currently $1.3 under budget)
  • Total Building: 111,700 sq. ft.
  • Area Renovated: 87,400 sq. ft.

Schedule Highlights

  • Kick Off 2/15/02
  • Demolition Start 5/6/02
  • Construction Start 5/20/02
  • Train #1 Water Batch 11/4/02
  • Train #2 Qualification Batch..11/18/02

Scope Features:

  • Delta V System (1200 I/O), with Bus technology
  • Multi Train & Multi Phase Installs
  • Extensive Site rehabilitation for Drainage

Engage Engage SPEC in your General Manufacturing Project

Related Projects:

ArkwrightArkwright
SPEC has designed, constructed and performance tested a 5000 square foot, $4.7M, specialty coatings manufacturing facility within strict budget, time and performance constraints... more

DSM NeoSolDSM NeoSol
Delivered on a Design/Build basis, this project involved the relocation, upgrade and startup of DSM NeoSol’s entire polyurethane manufacturing operations as well as the build-out of their offices... more

Astra Zeneca (Methanol)Astra Zeneca (Methanol)
SPEC worked with Donovan Engineering and Construction as a contracting team to install a new methanol storage, delivery, and waste collection system for Astra/Zenica pharmaceuticals... more

Johnson MatheyJohnson Mathey
SPEC worked with Donovan Engineering and Construction as a contracting team to install a new methanol storage, delivery, and waste collection system for Astra/Zenica pharmaceuticals... more

 

Subscribe to SPEC's email list: