| 781.221.0123|Client Login
Projects > General Manufacturing

Cabot
Project Description:
SPEC has provided a Design / Build package for this new manufacturing facility. The project schedule and budgetary goals are being exceeded and the project Team is looking forward to runs of initial product in the next 2-3 weeks.
Project Highlights:
- Contract Basis Design / Build - Open Book
- Contract Value $ 8.8 million (currently $1.3 under budget)
- Total Building: 111,700 sq. ft.
- Area Renovated: 87,400 sq. ft.
Schedule Highlights
- Kick Off 2/15/02
- Demolition Start 5/6/02
- Construction Start 5/20/02
- Train #1 Water Batch 11/4/02
- Train #2 Qualification Batch..11/18/02
Scope Features:
- Delta V System (1200 I/O), with Bus technology
- Multi Train & Multi Phase Installs
- Extensive Site rehabilitation for Drainage
Engage SPEC in your General Manufacturing Project
Related Projects:
Arkwright
SPEC has designed, constructed and performance tested a 5000 square foot, $4.7M, specialty coatings manufacturing facility within strict budget, time and performance constraints... more
DSM NeoSol
Delivered on a Design/Build basis, this project involved the relocation, upgrade and startup of DSM NeoSol’s entire polyurethane manufacturing operations as well as the build-out of their offices... more
Astra Zeneca (Methanol)
SPEC worked with Donovan Engineering and Construction as a contracting team to install a new methanol storage, delivery, and waste collection system for Astra/Zenica pharmaceuticals... more
Johnson Mathey
SPEC worked with Donovan Engineering and Construction as a contracting team to install a new methanol storage, delivery, and waste collection system for Astra/Zenica pharmaceuticals... more
Working With SPEC
To engage SPEC on your project, please select from the options below:
- Starting a New Project
- Upgrades/Repairs to Existing Facilities
- Buying a Product from SPEC