DSM NeoSol, Inc.
Project Description:
Delivered on a Design/Build basis, this project involved the relocation, upgrade and startup of DSM NeoSol’s entire polyurethane manufacturing operations as well as the build-out of their offices and laboratories in the new location. SPEC found and evaluated the appropriate new site location that would meet DSM’s short-term and long-term operational goals. SPEC also worked closely with local authorities and environmental consultants to secure all required permits and site approvals.
Project Highlights:
- Two phase project approach.
- Phase 1 – East Providence building retrofit.
- Phase 2 – Relocated W. Warwick operations.
- 67,700 ft2 single story base building separated into two buildings with double 4-hour walls for the following classification areas.
- Building 1 - 13,000 ft2 high hazard (H2) use group space.
- Building 2 - 54,700 ft2 with 4 control areas:
- 3,300 ft2 H2 flammable storage occupancy.
- 51,300 ft2 mixed use area with B, F-1 and S-1 use groups.
- Exterior solvent tank farm.
- New manufacturing platforms for solvent and aqueous manufacturing.
- Scale-up and improvement of Coatings operation.
- Delta V DCS batch process system with over 700 points.
- New process utilities and distribution including cooling tower, 230°F pressurized hot water boiler, compressed air and breathing air, and bulk nitrogen storage.
- Added 2000 amps of 480 volt power and distribution.
- Evaluation and re-commissioning of two 150 psi boilers and 100 psi compressed air systems.
Engage SPEC in your Fine Chemicals Project
Related Projects:
Working With SPEC
To engage SPEC on your project, please select from the options below:
- Starting a New Project
- Upgrades/Repairs to Existing Facilities
- Buying a Product from SPEC