Project Description:

This Design/Build project was delivered on a Guaranteed Maximum Price (GMP) contract. SPEC involvement began on the Process Flow Diagram (PFD) development level, included site selection and town approval and continued through eventual plant start up and testing. It was a successful project as Aspen Aerogels obtained their facility both on-time and on-budget.

Project Highlights:

  • Contract Basis – Open Book, guaranteed maximum price
  • Total Building Size – 150,000 SF.
  • High Hazard Manufacturing Space – 23,000 SF with space designed to double this amount in the future.
  • Tank Farm – Four 25,000-gallon and four 10,000-gallon tanks of hazardous materials. Also included two 100,000-lb liquefied Carbon Dioxide tanks and a 10,000-gal liquefied Nitrogen tank.
  • Piping included high pressure (3000 psig) specifications designed for supercritical fluids.
  • Process design via intelligent P&ID software and 3D pipe modeling program. SPEC worked with the piping subcontractor to develop isometric drawings directly from the modeling program, saving time and money during construction.
  • ABB DCS batch process system incorporating continuous product flow management with over 1400 points.
  • Process and manufacturing based performance criteria for measurement of project completion.

Engage Engage SPEC for your Nano Technology Project

Related Projects:

Featured Problem Solvers

Pete Rogers

George Roberts

Featured Projects

Antigenics, LLCAntigenics, LLC
SPEC successfully designed, constructed and commissioned a 30,000 square-foot Pilot-Scale manufactur... more

ArkwrightArkwright
SPEC has designed, constructed and performance tested a 5000 square foot, $4.7M, specialty coatings ... more

ASTeXASTeX
SPEC provided a Design / Build / Commissioning package to ASTeX, for the relocation of their combine... more

AstraZeneca (Air Dryer)AstraZeneca (Air Dryer)
SPEC worked with Donovan Engineering and Construction as a design-build team to install a new Air Dr... more

AstraZeneca (Methanol)AstraZeneca (Methanol)
SPEC worked with Donovan Engineering and Construction as a contracting team to install a new methano... more

CabotCabot
SPEC has provided a Design / Build package for this new manufacturing facility. The project schedule... more

Central ArteryCentral Artery
SPEC has successfully completed the first phase of this ongoing project with the commissioning of th... more

Confidential Client - Cellulosic Ethanol PlantConfidential Client - Cellulosic Ethanol Plant
The client initially contracted SPEC to provide process engineering expertise for their fermentation... more

DSM NeoSolDSM NeoSol
Delivered on a Design/Build basis, this project involved the relocation, upgrade and startup of DSM ... more

E InkE Ink
The client contacted SPEC to work with them in expanding one of their downstream process manufacturi... more

EntegrisEntegris
This project was delivered on a Design / Build basis, with a fast track focus due to client requirem... more

IntelliSenseIntelliSense
SPEC provided a Design / Build package for IntelliSense Corporation for the design, construction and... more

Johnson MattheyJohnson Matthey
SPEC has supported Pharm Eco Labs (now Johnson Matthey Pharmaceuticals Services), dating back to 199... more

KonarkaKonarka
Konarka, a fast growing photovoltaic company out of Lowell, MA, decided to modify their process and ... more

Qteros (Formerly SunEthanol)Qteros (Formerly SunEthanol)
A venture capital funded Cellulosic Ethanol company growing out of small lab space located near the ... more

St. GobainSt. Gobain
A global technology company had developed a solid oxide fuel cell (SOFC) ceramic fuel cell technolog... more

 

Subscribe to SPEC's email list: