This project was delivered on a Design / Build basis, with a fast track focus due to client requirements. Entegris & SPEC have enjoyed a successful project with schedule and budget targets obtained.
Project Highlights Include:
- Contract Basis Design / Build Open Book
- Contract Value $12 Million
- Total Building Size 200,000 SF
- SPEC Area Renovated 109,000 SF
- SPEC Area Built – Out From Shell 41,000 SF
- Total Area Renovated 150,000 SF
Schedule Highlights:
- Start Design February 1, 2002
- Demolition Starts May 1, 2002
- Construction Starts June 1, 2002
- Phase I MFG First Move In August 19, 2002
- Phase I MFG Move In Complete September 30, 2002
- Phase II Laboratories Complete December 15, 2002
Key Scope Features:
- Conversion of Existing Class 10,000 Clean Rooms to Class 1000
- Significant Utilities and Power Installed to Ceiling Mounted “Patch Panels”
- 75 GPM RODI System with Trending System
- Full Service Kitchen and Cafeteria
- 50 HZ Power Converter and Distribution
- Upgraded Base Building HVAC Plant
Engage SPEC for your Microelectronics Project
Related Projects:
ASTeX
SPEC provided a Design / Build / Commissioning package to ASTeX, for the relocation of their combine... more
IntelliSense
SPEC provided a Design / Build package for IntelliSense Corporation for the design, construction and... more
Featured Projects
Antigenics, LLC
SPEC successfully designed, constructed and commissioned a 30,000 square-foot Pilot-Scale manufactur... more
Arkwright
SPEC has designed, constructed and performance tested a 5000 square foot, $4.7M, specialty coatings ... more
Aspen Aerogels
This Design/Build project was delivered on a Guaranteed Maximum Price (GMP) contract. SPEC involveme... more
ASTeX
SPEC provided a Design / Build / Commissioning package to ASTeX, for the relocation of their combine... more
AstraZeneca (Air Dryer)
SPEC worked with Donovan Engineering and Construction as a design-build team to install a new Air Dr... more
AstraZeneca (Methanol)
SPEC worked with Donovan Engineering and Construction as a contracting team to install a new methano... more
Cabot
SPEC has provided a Design / Build package for this new manufacturing facility. The project schedule... more
Central Artery
SPEC has successfully completed the first phase of this ongoing project with the commissioning of th... more
Confidential Client - Cellulosic Ethanol Plant
The client initially contracted SPEC to provide process engineering expertise for their fermentation... more
DSM NeoSol
Delivered on a Design/Build basis, this project involved the relocation, upgrade and startup of DSM ... more
E Ink
The client contacted SPEC to work with them in expanding one of their downstream process manufacturi... more
IntelliSense
SPEC provided a Design / Build package for IntelliSense Corporation for the design, construction and... more
Johnson Matthey
SPEC has supported Pharm Eco Labs (now Johnson Matthey Pharmaceuticals Services), dating back to 199... more
Konarka
Konarka, a fast growing photovoltaic company out of Lowell, MA, decided to modify their process and ... more
Qteros (Formerly SunEthanol)
A venture capital funded Cellulosic Ethanol company growing out of small lab space located near the ... more
St. Gobain
A global technology company had developed a solid oxide fuel cell (SOFC) ceramic fuel cell technolog... more