Project Description:

This project was delivered on a Design / Build basis, with a fast track focus due to client requirements. Entegris & SPEC have enjoyed a successful project with schedule and budget targets obtained.

Project Highlights Include:

  • Contract Basis Design / Build Open Book
  • Contract Value $12 Million
  • Total Building Size 200,000 SF
  • SPEC Area Renovated 109,000 SF
  • SPEC Area Built – Out From Shell 41,000 SF
  • Total Area Renovated 150,000 SF

Schedule Highlights:

  • Start Design February 1, 2002
  • Demolition Starts May 1, 2002
  • Construction Starts June 1, 2002
  • Phase I MFG First Move In August 19, 2002
  • Phase I MFG Move In Complete September 30, 2002
  • Phase II Laboratories Complete December 15, 2002

Key Scope Features:

  • Conversion of Existing Class 10,000 Clean Rooms to Class 1000
  • Significant Utilities and Power Installed to Ceiling Mounted “Patch Panels”
  • 75 GPM RODI System with Trending System
  • Full Service Kitchen and Cafeteria
  • 50 HZ Power Converter and Distribution
  • Upgraded Base Building HVAC Plant

Engage Engage SPEC for your Microelectronics Project

Related Projects:

ASTeXASTeX
SPEC provided a Design / Build / Commissioning package to ASTeX, for the relocation of their combine... more

IntelliSenseIntelliSense
SPEC provided a Design / Build package for IntelliSense Corporation for the design, construction and... more

Featured Problem Solvers

Pete Rogers

George Roberts

Featured Projects

Antigenics, LLCAntigenics, LLC
SPEC successfully designed, constructed and commissioned a 30,000 square-foot Pilot-Scale manufactur... more

ArkwrightArkwright
SPEC has designed, constructed and performance tested a 5000 square foot, $4.7M, specialty coatings ... more

Aspen AerogelsAspen Aerogels
This Design/Build project was delivered on a Guaranteed Maximum Price (GMP) contract. SPEC involveme... more

ASTeXASTeX
SPEC provided a Design / Build / Commissioning package to ASTeX, for the relocation of their combine... more

AstraZeneca (Air Dryer)AstraZeneca (Air Dryer)
SPEC worked with Donovan Engineering and Construction as a design-build team to install a new Air Dr... more

AstraZeneca (Methanol)AstraZeneca (Methanol)
SPEC worked with Donovan Engineering and Construction as a contracting team to install a new methano... more

CabotCabot
SPEC has provided a Design / Build package for this new manufacturing facility. The project schedule... more

Central ArteryCentral Artery
SPEC has successfully completed the first phase of this ongoing project with the commissioning of th... more

Confidential Client - Cellulosic Ethanol PlantConfidential Client - Cellulosic Ethanol Plant
The client initially contracted SPEC to provide process engineering expertise for their fermentation... more

DSM NeoSolDSM NeoSol
Delivered on a Design/Build basis, this project involved the relocation, upgrade and startup of DSM ... more

E InkE Ink
The client contacted SPEC to work with them in expanding one of their downstream process manufacturi... more

IntelliSenseIntelliSense
SPEC provided a Design / Build package for IntelliSense Corporation for the design, construction and... more

Johnson MattheyJohnson Matthey
SPEC has supported Pharm Eco Labs (now Johnson Matthey Pharmaceuticals Services), dating back to 199... more

KonarkaKonarka
Konarka, a fast growing photovoltaic company out of Lowell, MA, decided to modify their process and ... more

Qteros (Formerly SunEthanol)Qteros (Formerly SunEthanol)
A venture capital funded Cellulosic Ethanol company growing out of small lab space located near the ... more

St. GobainSt. Gobain
A global technology company had developed a solid oxide fuel cell (SOFC) ceramic fuel cell technolog... more

 

Subscribe to SPEC's email list: